Discussion Starter · #1 · (Edited)
Order placed April 2012 even with this my car was somewhere between 500 and 600 built.
1100 order accepted 6/12/2013
1102 Preliminary Order added thru webb 6/12/2013
2000 accepted by GM 6/17/2013
2500 preferenced 6/18/2013
3000 accepted by production control 6/20/2013
3100 availabe to Sequence 6/20/2013
3300 scheduled for production 7/25/2013
3450 Import vehicle produced 8/30/2013
3550 Import vehicle shipped from POO 10/06/2013 Shipped from Au Sept. 16 from Japan on the 10/06/2013 date
3750 Import vehicle recieved at POE 10/22/2013
3800 produced 10/30/2013
4000 Available to ship 10/30/2013
4150 Original Invoice 10/31/2013 and shipped

Hope this helps everyone questions? end of transit 11/11/2013
z51vett
Doug:Dance:
All this info came from Work Bench History print out.
Car was actual number 42 or so built.
 

· Super Moderator
Joined
·
5,937 Posts
Discussion Starter · #3 ·
They list EXP I/T On the invoice mine reads 11/11/13. But I've seen it go over or under. Sorry for the delay in answering should correct that to read del. Might get more folks interested.
z51vett
Doug
 

· Super Moderator
Joined
·
5,937 Posts
Discussion Starter · #4 ·
They list EXP I/T On the invoice mine reads 11/11/13. But I've seen it go over or under. Sorry for the delay in answering should correct that to read del. Might get more folks interested.
z51vett
Doug
3800 produced is after it's on US soil after inspection window stickers then invoices .
Z51vett
Doug
 