Order placed April 2012 even with this my car was somewhere between 500 and 600 built.
1100 order accepted 6/12/2013
1102 Preliminary Order added thru webb 6/12/2013
2000 accepted by GM 6/17/2013
2500 preferenced 6/18/2013
3000 accepted by production control 6/20/2013
3100 availabe to Sequence 6/20/2013
3300 scheduled for production 7/25/2013
3450 Import vehicle produced 8/30/2013
3550 Import vehicle shipped from POO 10/06/2013 Shipped from Au Sept. 16 from Japan on the 10/06/2013 date
3750 Import vehicle recieved at POE 10/22/2013
3800 produced 10/30/2013
4000 Available to ship 10/30/2013
4150 Original Invoice 10/31/2013 and shipped
Hope this helps everyone questions? end of transit 11/11/2013
z51vett
Doug
ance:
All this info came from Work Bench History print out.
Car was actual number 42 or so built.
1100 order accepted 6/12/2013
1102 Preliminary Order added thru webb 6/12/2013
2000 accepted by GM 6/17/2013
2500 preferenced 6/18/2013
3000 accepted by production control 6/20/2013
3100 availabe to Sequence 6/20/2013
3300 scheduled for production 7/25/2013
3450 Import vehicle produced 8/30/2013
3550 Import vehicle shipped from POO 10/06/2013 Shipped from Au Sept. 16 from Japan on the 10/06/2013 date
3750 Import vehicle recieved at POE 10/22/2013
3800 produced 10/30/2013
4000 Available to ship 10/30/2013
4150 Original Invoice 10/31/2013 and shipped
Hope this helps everyone questions? end of transit 11/11/2013
z51vett
Doug
All this info came from Work Bench History print out.
Car was actual number 42 or so built.